Mvrpc(EV#35)
AvailableEV charging station in Troy, Ohio on the Blink network — 2 Level 2. US DOE AFDC station 383915.
At a glance
Mvrpc(EV#35) is a public EV charging station at 3147 North County Road 25A in Troy, Ohio, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 10, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 383915 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 10, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- American Honda Motor Co, Inc12 ports
AmpUp · Available
- Meijer Troy, OH #1124 ports
EVgo · Available
- Kettering Health Troy4 ports
Blink · Available
- Chevrolet Of Troy3 ports
Non-networked · Available
- Dave Arbogast Buick-GMC2 ports
EV Connect · Available
- Bnc Left2 ports
ChargePoint · Available
What kind of charging does Mvrpc(EV#35) offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mvrpc(EV#35) compare with other stations in Troy?
Troy has 12 charging stations in the DOE registry with 38 ports. Mvrpc(EV#35) accounts for 5% of the charging ports in Troy. Blink runs 4 stations in Troy. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Mvrpc(EV#35)?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 228 of those stations are in Ohio, 11% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 10, 2025, one of 319 stations in Ohio with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mvrpc(EV#35) have?
Mvrpc(EV#35) has 2 charging ports: 2 Level 2.
Does Mvrpc(EV#35) have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mvrpc(EV#35) have?
Mvrpc(EV#35) has J1772 connectors.
Is Mvrpc(EV#35) open to the public?
Yes. Mvrpc(EV#35) is listed with public access, and its status is available.
Where is Mvrpc(EV#35)?
Mvrpc(EV#35) is at 3147 North County Road 25A, Troy, OH 45373. Its coordinates are 40.08987, -84.22404.
More EV charging around Troy
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 383915, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mvrpc(EV#35), Troy, OH (AFDC station 383915)”, https://chargecensus.com/stations/ohio/mvrpc-ev-35-383915 (data as of October 12, 2026).