ChargeCensus

Marble Cliff Mc South

Available

EV charging station in Columbus, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 153258.

At a glance

Marble Cliff Mc South is a public EV charging station at 1600 Fernwood Ave in Columbus, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Feb 4, 2020.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID153258
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 4, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1600 Fernwood Ave
State
Ohio
ZIP
43212
Coordinates
39.98880, -83.05917

Within ~15 km

Nearby charging

What kind of charging does Marble Cliff Mc South offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Marble Cliff Mc South compare with other stations in Columbus?

Columbus has 347 charging stations in the DOE registry with 977 ports, the most of 326 cities and towns in Ohio. Marble Cliff Mc South accounts for under 1% of the charging ports in Columbus. ChargePoint runs 263 stations in Columbus. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Marble Cliff Mc South?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 4, 2020, one of 88 stations in Ohio with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Marble Cliff Mc South have?

Marble Cliff Mc South has 1 charging port: 1 DC fast.

Does Marble Cliff Mc South have DC fast charging?

Yes. The registry lists 1 DC fast port at Marble Cliff Mc South, with CHAdeMO and CCS connectors.

What connectors does Marble Cliff Mc South have?

Marble Cliff Mc South has CHAdeMO and CCS connectors.

Is Marble Cliff Mc South open to the public?

Yes. Marble Cliff Mc South is listed with public access, and its status is available.

Where is Marble Cliff Mc South?

Marble Cliff Mc South is at 1600 Fernwood Ave, Columbus, OH 43212. Its coordinates are 39.98880, -83.05917.

More EV charging around Columbus

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 153258, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Marble Cliff Mc South, Columbus, OH (AFDC station 153258)”, https://chargecensus.com/stations/ohio/marble-cliff-mc-south-153258 (data as of October 12, 2026).