Laz Columbus Oh Gvy North 02
AvailableEV charging station in Grandview Heights, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 147023.
At a glance
Laz Columbus Oh Gvy North 02 is a public EV charging station at 975 Rail St in Grandview Heights, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 17, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 147023 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 17, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 975 Rail St
- City
- Grandview Heights
- State
- Ohio
- ZIP
- 43212
- Coordinates
- 39.98298, -83.02653
Within ~15 km
Nearby charging
- JPMC Vision40 ports
Loop · Available
Non-networked · Planned
- AEP - Unassigned Garage20 ports
PowerFlex · Available
Tesla Supercharger · Available
- 195 E. Broad Street Garage13 ports
Flash · Available
- Ricart Megamall12 ports
Blink · Available
What kind of charging does Laz Columbus Oh Gvy North 02 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Laz Columbus Oh Gvy North 02 compare with other stations in Grandview Heights?
Grandview Heights has 5 charging stations in the DOE registry with 10 ports. Laz Columbus Oh Gvy North 02 accounts for 20% of the charging ports in Grandview Heights. ChargePoint runs 5 stations in Grandview Heights. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Laz Columbus Oh Gvy North 02?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 17, 2019, one of 93 stations in Ohio with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Laz Columbus Oh Gvy North 02 have?
Laz Columbus Oh Gvy North 02 has 2 charging ports: 2 Level 2.
Does Laz Columbus Oh Gvy North 02 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Laz Columbus Oh Gvy North 02 have?
Laz Columbus Oh Gvy North 02 has J1772 connectors.
Is Laz Columbus Oh Gvy North 02 open to the public?
Yes. Laz Columbus Oh Gvy North 02 is listed with public access, and its status is available.
Where is Laz Columbus Oh Gvy North 02?
Laz Columbus Oh Gvy North 02 is at 975 Rail St, Grandview Heights, OH 43212. Its coordinates are 39.98298, -83.02653.
More EV charging around Grandview Heights
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 147023, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Laz Columbus Oh Gvy North 02, Grandview Heights, OH (AFDC station 147023)”, https://chargecensus.com/stations/ohio/laz-columbus-oh-gvy-north-02-147023 (data as of October 12, 2026).