ChargeCensus

Lakewood Winterhurst

Available

EV charging station in Lakewood, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 143419.

At a glance

Lakewood Winterhurst is a public EV charging station at 14740 Lakewood Heights in Lakewood, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 15, 2019.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID143419
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 15, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
14740 Lakewood Heights
State
Ohio
ZIP
44107
Coordinates
41.47068, -81.79948

Within ~15 km

Nearby charging

What kind of charging does Lakewood Winterhurst offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Lakewood Winterhurst compare with other stations in Lakewood?

Lakewood has 15 charging stations in the DOE registry with 26 ports, the 19th-most of 326 cities and towns in Ohio. Lakewood Winterhurst accounts for 4% of the charging ports in Lakewood. ChargePoint runs 13 stations in Lakewood. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Lakewood Winterhurst?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2019, one of 93 stations in Ohio with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lakewood Winterhurst have?

Lakewood Winterhurst has 1 charging port: 1 DC fast.

Does Lakewood Winterhurst have DC fast charging?

Yes. The registry lists 1 DC fast port at Lakewood Winterhurst, with CHAdeMO and CCS connectors.

What connectors does Lakewood Winterhurst have?

Lakewood Winterhurst has CHAdeMO and CCS connectors.

Is Lakewood Winterhurst open to the public?

Yes. Lakewood Winterhurst is listed with public access, and its status is available.

Where is Lakewood Winterhurst?

Lakewood Winterhurst is at 14740 Lakewood Heights, Lakewood, OH 44107. Its coordinates are 41.47068, -81.79948.

More EV charging around Lakewood

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 143419, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lakewood Winterhurst, Lakewood, OH (AFDC station 143419)”, https://chargecensus.com/stations/ohio/lakewood-winterhurst-143419 (data as of October 12, 2026).