Kent State University - Lot R-19
AvailableEV charging station in Kent, Ohio, not on a charging network — 1 Level 2. US DOE AFDC station 196553.
At a glance
Kent State University - Lot R-19 is a public EV charging station at Art Annex in Kent, Ohio, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 30, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 196553 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Sep 30, 2021 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $1.25 per hour; Max 4 hours
Within ~15 km
Nearby charging
- Menards Kent 3371 (Kent, OH)12 ports
Electrify America · Available
Blink · Available
Tesla Destination · Available
- Klaben Ford - Service6 ports
Blink · Available
EVgo · Available
Blink · Available
What kind of charging does Kent State University - Lot R-19 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$1.25 per hour; Max 4 hours”. The site is listed as a parking lot location.
How does Kent State University - Lot R-19 compare with other stations in Kent?
Kent has 33 charging stations in the DOE registry with 90 ports, the 8th-most of 326 cities and towns in Ohio. Kent State University - Lot R-19 accounts for 1% of the charging ports in Kent. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Kent State University - Lot R-19?
Kent State University - Lot R-19 is listed as non-networked: its chargers are not run through a charging-network account. Ohio has 307 non-networked stations, 14% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 30, 2021, one of 281 stations in Ohio with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Kent State University - Lot R-19 have?
Kent State University - Lot R-19 has 1 charging port: 1 Level 2.
Does Kent State University - Lot R-19 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Kent State University - Lot R-19 have?
Kent State University - Lot R-19 has J1772 connectors.
Is charging at Kent State University - Lot R-19 free?
Pricing as reported to the DOE registry: $1.25 per hour; Max 4 hours.
Is Kent State University - Lot R-19 open to the public?
Yes. Kent State University - Lot R-19 is listed with public access, and its status is available.
Where is Kent State University - Lot R-19?
Kent State University - Lot R-19 is at Art Annex, Kent, OH 44243. Its coordinates are 41.15080, -81.34684.
More EV charging around Kent
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 196553, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Kent State University - Lot R-19, Kent, OH (AFDC station 196553)”, https://chargecensus.com/stations/ohio/kent-state-university-lot-r-19-196553 (data as of October 12, 2026).