Jeff Wyler Power Link
AvailableEV charging station in Springfield, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 355166.
At a glance
Jeff Wyler Power Link is a public EV charging station at 1501 Hillcrest Avenue in Springfield, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 7, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 355166 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 7, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1501 Hillcrest Avenue
- City
- Springfield
- State
- Ohio
- ZIP
- 45504
- Coordinates
- 39.94236, -83.83399
Within ~15 km
Nearby charging
IONNA · Available
- Bryan Center2 ports
Blink · Available
- The Last Queen Station12 ports
ChargePoint · Available
Non-networked · Available
- C.J. Brown Dam and Reservoir1 ports
Non-networked · Planned
What kind of charging does Jeff Wyler Power Link offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Jeff Wyler Power Link compare with other stations in Springfield?
Springfield has 4 charging stations in the DOE registry with 13 ports. Jeff Wyler Power Link accounts for 8% of the charging ports in Springfield. It is the only ChargePoint station in Springfield. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Jeff Wyler Power Link?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 7, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Jeff Wyler Power Link have?
Jeff Wyler Power Link has 1 charging port: 1 DC fast.
Does Jeff Wyler Power Link have DC fast charging?
Yes. The registry lists 1 DC fast port at Jeff Wyler Power Link, with CHAdeMO and CCS connectors.
What connectors does Jeff Wyler Power Link have?
Jeff Wyler Power Link has CHAdeMO and CCS connectors.
Is Jeff Wyler Power Link open to the public?
Yes. Jeff Wyler Power Link is listed with public access, and its status is available.
Where is Jeff Wyler Power Link?
Jeff Wyler Power Link is at 1501 Hillcrest Avenue, Springfield, OH 45504. Its coordinates are 39.94236, -83.83399.
More EV charging around Springfield
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 355166, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Jeff Wyler Power Link, Springfield, OH (AFDC station 355166)”, https://chargecensus.com/stations/ohio/jeff-wyler-power-link-355166 (data as of October 12, 2026).