ChargeCensus

Grove City West Gc Mob 1

Available

EV charging station in Grove City, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 260375.

At a glance

Grove City West Gc Mob 1 is a public EV charging station at 3503 Southwest Blvd in Grove City, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 6, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID260375
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 6, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3503 Southwest Blvd
State
Ohio
ZIP
43123
Coordinates
39.89208, -83.09690

Within ~15 km

Nearby charging

What kind of charging does Grove City West Gc Mob 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Grove City West Gc Mob 1 compare with other stations in Grove City?

Grove City has 14 charging stations in the DOE registry with 36 ports, the 20th-most of 326 cities and towns in Ohio. Grove City West Gc Mob 1 accounts for 6% of the charging ports in Grove City. ChargePoint runs 9 stations in Grove City. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Grove City West Gc Mob 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 6, 2023, one of 305 stations in Ohio with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Grove City West Gc Mob 1 have?

Grove City West Gc Mob 1 has 2 charging ports: 2 Level 2.

Does Grove City West Gc Mob 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Grove City West Gc Mob 1 have?

Grove City West Gc Mob 1 has J1772 connectors.

Is Grove City West Gc Mob 1 open to the public?

Yes. Grove City West Gc Mob 1 is listed with public access, and its status is available.

Where is Grove City West Gc Mob 1?

Grove City West Gc Mob 1 is at 3503 Southwest Blvd, Grove City, OH 43123. Its coordinates are 39.89208, -83.09690.

More EV charging around Grove City

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 260375, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Grove City West Gc Mob 1, Grove City, OH (AFDC station 260375)”, https://chargecensus.com/stations/ohio/grove-city-west-gc-mob-1-260375 (data as of October 12, 2026).