ChargeCensus

Gccg 2

Available

EV charging station in Toledo, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 251959.

At a glance

Gccg 2 is a public EV charging station at 401 Jefferson Ave in Toledo, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 25, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID251959
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 25, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
401 Jefferson Ave
City
Toledo
State
Ohio
ZIP
43604
Coordinates
41.64934, -83.53665

Within ~15 km

Nearby charging

What kind of charging does Gccg 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Gccg 2 compare with other stations in Toledo?

Toledo has 48 charging stations in the DOE registry with 132 ports, the 5th-most of 326 cities and towns in Ohio. Gccg 2 accounts for 2% of the charging ports in Toledo. ChargePoint runs 22 stations in Toledo. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Gccg 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 25, 2023, one of 305 stations in Ohio with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Gccg 2 have?

Gccg 2 has 2 charging ports: 2 Level 2.

Does Gccg 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Gccg 2 have?

Gccg 2 has J1772 connectors.

Is Gccg 2 open to the public?

Yes. Gccg 2 is listed with public access, and its status is available.

Where is Gccg 2?

Gccg 2 is at 401 Jefferson Ave, Toledo, OH 43604. Its coordinates are 41.64934, -83.53665.

More EV charging around Toledo

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 251959, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gccg 2, Toledo, OH (AFDC station 251959)”, https://chargecensus.com/stations/ohio/gccg-2-251959 (data as of October 12, 2026).