Frost Roofing Inc
AvailableEV charging station in Wapakoneta, Ohio, not on a charging network — 2 Level 2. US DOE AFDC station 200619.
At a glance
Frost Roofing Inc is a public EV charging station at 2 Broadway St in Wapakoneta, Ohio, not attached to a charging network. It has 2 charging ports (2 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since Oct 29, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 200619 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Oct 29, 2021 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: Free
Location
- Address
- 2 Broadway St
- City
- Wapakoneta
- State
- Ohio
- ZIP
- 45895
- Coordinates
- 40.56980, -84.19090
Within ~15 km
Nearby charging
IONNA · Available
- Casey's #3535 - Cridersville4 ports
Francis Energy · Available
ChargePoint · Available
- Apollo Career Apollo 12 ports
ChargePoint · Available
- PERRY proTECH - Lima Branch2 ports
evGateway · Available
- Apollo Career Apollo Fast 11 ports
ChargePoint · Available
What kind of charging does Frost Roofing Inc offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a other location.
How does Frost Roofing Inc compare with other stations in Wapakoneta?
Wapakoneta has 2 charging stations in the DOE registry with 4 ports. Frost Roofing Inc accounts for 50% of the charging ports in Wapakoneta. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Frost Roofing Inc?
Frost Roofing Inc is listed as non-networked: its chargers are not run through a charging-network account. Ohio has 307 non-networked stations, 14% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 29, 2021, one of 281 stations in Ohio with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Frost Roofing Inc have?
Frost Roofing Inc has 2 charging ports: 2 Level 2.
Does Frost Roofing Inc have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Frost Roofing Inc have?
Frost Roofing Inc has NACS (Tesla) connectors.
Is charging at Frost Roofing Inc free?
Pricing as reported to the DOE registry: Free.
Is Frost Roofing Inc open to the public?
Yes. Frost Roofing Inc is listed with public access, and its status is available.
Where is Frost Roofing Inc?
Frost Roofing Inc is at 2 Broadway St, Wapakoneta, OH 45895. Its coordinates are 40.56980, -84.19090.
More EV charging around Wapakoneta
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 200619, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Frost Roofing Inc, Wapakoneta, OH (AFDC station 200619)”, https://chargecensus.com/stations/ohio/frost-roofing-inc-200619 (data as of October 12, 2026).