ChargeCensus

Edison Brewing Fp #2

Available

EV charging station in Gahanna, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 181439.

At a glance

Edison Brewing Fp #2 is a public EV charging station at 785 Science Blvd in Gahanna, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID181439
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
785 Science Blvd
City
Gahanna
State
Ohio
ZIP
43230
Coordinates
39.99740, -82.84411

Within ~15 km

Nearby charging

What kind of charging does Edison Brewing Fp #2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Edison Brewing Fp #2 compare with other stations in Gahanna?

Gahanna has 5 charging stations in the DOE registry with 9 ports. Edison Brewing Fp #2 accounts for 22% of the charging ports in Gahanna. ChargePoint runs 4 stations in Gahanna. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Edison Brewing Fp #2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 281 stations in Ohio with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Edison Brewing Fp #2 have?

Edison Brewing Fp #2 has 2 charging ports: 2 Level 2.

Does Edison Brewing Fp #2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Edison Brewing Fp #2 have?

Edison Brewing Fp #2 has J1772 connectors.

Is Edison Brewing Fp #2 open to the public?

Yes. Edison Brewing Fp #2 is listed with public access, and its status is available.

Where is Edison Brewing Fp #2?

Edison Brewing Fp #2 is at 785 Science Blvd, Gahanna, OH 43230. Its coordinates are 39.99740, -82.84411.

More EV charging around Gahanna

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 181439, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Edison Brewing Fp #2, Gahanna, OH (AFDC station 181439)”, https://chargecensus.com/stations/ohio/edison-brewing-fp-2-181439 (data as of October 12, 2026).