E Building Station 2
AvailableEV charging station in Kirtland, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 434145.
At a glance
E Building Station 2 is a public EV charging station at 770 Clocktower Drive in Kirtland, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 23, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 434145 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 23, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 770 Clocktower Drive
- City
- Kirtland
- State
- Ohio
- ZIP
- 44094
- Coordinates
- 41.63753, -81.36191
Within ~15 km
Nearby charging
Tesla Supercharger · Available
IONNA · Available
Tesla Supercharger · Available
- Mentor Hospital6 ports
Blink · Available
Blink · Available
- Eastgate Shopping Center4 ports
EVgo · Available
What kind of charging does E Building Station 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does E Building Station 2 compare with other stations in Kirtland?
Kirtland has 3 charging stations in the DOE registry with 6 ports. E Building Station 2 accounts for 33% of the charging ports in Kirtland. ChargePoint runs 2 stations in Kirtland. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates E Building Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 23, 2025, one of 319 stations in Ohio with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does E Building Station 2 have?
E Building Station 2 has 2 charging ports: 2 Level 2.
Does E Building Station 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does E Building Station 2 have?
E Building Station 2 has J1772 connectors.
Is E Building Station 2 open to the public?
Yes. E Building Station 2 is listed with public access, and its status is available.
Where is E Building Station 2?
E Building Station 2 is at 770 Clocktower Drive, Kirtland, OH 44094. Its coordinates are 41.63753, -81.36191.
More EV charging around Kirtland
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 434145, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “E Building Station 2, Kirtland, OH (AFDC station 434145)”, https://chargecensus.com/stations/ohio/e-building-station-2-434145 (data as of October 12, 2026).