ChargeCensus

Cronin CDJR

Available

EV charging station in Lebanon, Ohio on the Blink network — 2 DC fast · 2 Level 2. US DOE AFDC station 351447.

At a glance

Cronin CDJR is a public EV charging station at 951 West Main Street in Lebanon, Ohio, on the Blink network. It has 4 charging ports (2 DC fast · 2 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Jul 22, 2024.

Total ports
4
DC fast
2
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID351447
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJul 22, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
951 West Main Street
State
Ohio
ZIP
45036
Coordinates
39.43396, -84.22338

Within ~15 km

Nearby charging

What kind of charging does Cronin CDJR offer?

Of its 4 ports, 2 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% above the Ohio average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Cronin CDJR compare with other stations in Lebanon?

Lebanon has 10 charging stations in the DOE registry with 27 ports. Cronin CDJR accounts for 15% of the charging ports in Lebanon. Blink runs 2 stations in Lebanon. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Cronin CDJR?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 228 of those stations are in Ohio, 11% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 22, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cronin CDJR have?

Cronin CDJR has 4 charging ports: 2 DC fast · 2 Level 2.

Does Cronin CDJR have DC fast charging?

Yes. The registry lists 2 DC fast ports at Cronin CDJR, with CCS connectors.

What connectors does Cronin CDJR have?

Cronin CDJR has J1772 and CCS connectors.

Is Cronin CDJR open to the public?

Yes. Cronin CDJR is listed with public access, and its status is available.

Where is Cronin CDJR?

Cronin CDJR is at 951 West Main Street, Lebanon, OH 45036. Its coordinates are 39.43396, -84.22338.

More EV charging around Lebanon

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 351447, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cronin CDJR, Lebanon, OH (AFDC station 351447)”, https://chargecensus.com/stations/ohio/cronin-cdjr-351447 (data as of October 12, 2026).