ChargeCensus

Coughlin Kia Dc Fast 1

Available

EV charging station in Lewis Center, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 221600.

At a glance

Coughlin Kia Dc Fast 1 is a public EV charging station at 5342 Columbus Pike in Lewis Center, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 22, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID221600
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 22, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5342 Columbus Pike
City
Lewis Center
State
Ohio
ZIP
43035
Coordinates
40.21915, -83.03383

Within ~15 km

Nearby charging

What kind of charging does Coughlin Kia Dc Fast 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Coughlin Kia Dc Fast 1 compare with other stations in Lewis Center?

Lewis Center has 6 charging stations in the DOE registry with 18 ports. Coughlin Kia Dc Fast 1 accounts for 6% of the charging ports in Lewis Center. ChargePoint runs 3 stations in Lewis Center. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Coughlin Kia Dc Fast 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 22, 2022, one of 345 stations in Ohio with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Coughlin Kia Dc Fast 1 have?

Coughlin Kia Dc Fast 1 has 1 charging port: 1 DC fast.

Does Coughlin Kia Dc Fast 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Coughlin Kia Dc Fast 1, with CHAdeMO and CCS connectors.

What connectors does Coughlin Kia Dc Fast 1 have?

Coughlin Kia Dc Fast 1 has CHAdeMO and CCS connectors.

Is Coughlin Kia Dc Fast 1 open to the public?

Yes. Coughlin Kia Dc Fast 1 is listed with public access, and its status is available.

Where is Coughlin Kia Dc Fast 1?

Coughlin Kia Dc Fast 1 is at 5342 Columbus Pike, Lewis Center, OH 43035. Its coordinates are 40.21915, -83.03383.

More EV charging around Lewis Center

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 221600, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Coughlin Kia Dc Fast 1, Lewis Center, OH (AFDC station 221600)”, https://chargecensus.com/stations/ohio/coughlin-kia-dc-fast-1-221600 (data as of October 12, 2026).