Cota G.C. P&R Unit 3
Temporarily unavailableEV charging station in Grove City, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 207672.
At a glance
Cota G.C. P&R Unit 3 is a public EV charging station at 2321 Old Stringtown Rd in Grove City, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Mar 5, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 207672 |
| Network | ChargePoint |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Mar 5, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2321 Old Stringtown Rd
- City
- Grove City
- State
- Ohio
- ZIP
- 43123
- Coordinates
- 39.87865, -83.06428
Within ~15 km
Nearby charging
- AEP - Unassigned Garage20 ports
PowerFlex · Available
- 195 E. Broad Street Garage13 ports
Flash · Available
Tesla Supercharger · Available
- Google12 ports
ChargePoint · Available
- Ohio Center Garage10 ports
Non-networked · Available
- The Electrical Trades Center10 ports
Blink · Available
What kind of charging does Cota G.C. P&R Unit 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cota G.C. P&R Unit 3 compare with other stations in Grove City?
Grove City has 14 charging stations in the DOE registry with 36 ports, the 20th-most of 326 cities and towns in Ohio. Cota G.C. P&R Unit 3 accounts for 6% of the charging ports in Grove City. ChargePoint runs 9 stations in Grove City. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Cota G.C. P&R Unit 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 5, 2022, one of 345 stations in Ohio with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cota G.C. P&R Unit 3 have?
Cota G.C. P&R Unit 3 has 2 charging ports: 2 Level 2.
Does Cota G.C. P&R Unit 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cota G.C. P&R Unit 3 have?
Cota G.C. P&R Unit 3 has J1772 connectors.
Is Cota G.C. P&R Unit 3 open to the public?
Yes. Cota G.C. P&R Unit 3 is listed with public access, and its status is temporarily unavailable.
Where is Cota G.C. P&R Unit 3?
Cota G.C. P&R Unit 3 is at 2321 Old Stringtown Rd, Grove City, OH 43123. Its coordinates are 39.87865, -83.06428.
More EV charging around Grove City
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 207672, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cota G.C. P&R Unit 3, Grove City, OH (AFDC station 207672)”, https://chargecensus.com/stations/ohio/cota-g-c-p-r-unit-3-207672 (data as of October 12, 2026).