ChargeCensus

City Of Bedford Muni Lot 2

Available

EV charging station in Bedford, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 202728.

At a glance

City Of Bedford Muni Lot 2 is a public EV charging station at 695 Broadway Ave in Bedford, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 17, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID202728
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 17, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
695 Broadway Ave
City
Bedford
State
Ohio
ZIP
44146
Coordinates
41.39174, -81.53496

Within ~15 km

Nearby charging

What kind of charging does City Of Bedford Muni Lot 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of Bedford Muni Lot 2 compare with other stations in Bedford?

Bedford has 8 charging stations in the DOE registry with 17 ports. City Of Bedford Muni Lot 2 accounts for 12% of the charging ports in Bedford. ChargePoint runs 2 stations in Bedford. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates City Of Bedford Muni Lot 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 17, 2021, one of 281 stations in Ohio with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of Bedford Muni Lot 2 have?

City Of Bedford Muni Lot 2 has 2 charging ports: 2 Level 2.

Does City Of Bedford Muni Lot 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of Bedford Muni Lot 2 have?

City Of Bedford Muni Lot 2 has J1772 connectors.

Is City Of Bedford Muni Lot 2 open to the public?

Yes. City Of Bedford Muni Lot 2 is listed with public access, and its status is available.

Where is City Of Bedford Muni Lot 2?

City Of Bedford Muni Lot 2 is at 695 Broadway Ave, Bedford, OH 44146. Its coordinates are 41.39174, -81.53496.

More EV charging around Bedford

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 202728, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of Bedford Muni Lot 2, Bedford, OH (AFDC station 202728)”, https://chargecensus.com/stations/ohio/city-of-bedford-muni-lot-2-202728 (data as of October 12, 2026).