Cak Airport Short Term 1-2
AvailableEV charging station in North Canton, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 200501.
At a glance
Cak Airport Short Term 1-2 is a public EV charging station at 5400 Lauby Rd in North Canton, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 4, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 200501 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 4, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5400 Lauby Rd
- City
- North Canton
- State
- Ohio
- ZIP
- 44720
- Coordinates
- 40.91445, -81.43523
Within ~15 km
Nearby charging
- Canton Oh Sdc88 ports
Non-networked · Available
Tesla Supercharger · Available
- Belden Park Crossings6 ports
EVgo · Available
- Liberty Ford Canton4 ports
Non-networked · Available
- Hampton Inn - Canton4 ports
Francis Energy · Available
EnviroSpark · Available
What kind of charging does Cak Airport Short Term 1-2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cak Airport Short Term 1-2 compare with other stations in North Canton?
North Canton has 10 charging stations in the DOE registry with 30 ports. Cak Airport Short Term 1-2 accounts for 7% of the charging ports in North Canton. ChargePoint runs 5 stations in North Canton. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Cak Airport Short Term 1-2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 4, 2021, one of 281 stations in Ohio with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cak Airport Short Term 1-2 have?
Cak Airport Short Term 1-2 has 2 charging ports: 2 Level 2.
Does Cak Airport Short Term 1-2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cak Airport Short Term 1-2 have?
Cak Airport Short Term 1-2 has J1772 connectors.
Is Cak Airport Short Term 1-2 open to the public?
Yes. Cak Airport Short Term 1-2 is listed with public access, and its status is available.
Where is Cak Airport Short Term 1-2?
Cak Airport Short Term 1-2 is at 5400 Lauby Rd, North Canton, OH 44720. Its coordinates are 40.91445, -81.43523.
More EV charging around North Canton
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 200501, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cak Airport Short Term 1-2, North Canton, OH (AFDC station 200501)”, https://chargecensus.com/stations/ohio/cak-airport-short-term-1-2-200501 (data as of October 12, 2026).