Byers Chevrolet
AvailableEV charging station in Grove City, Ohio on the EV Connect network — 2 DC fast. US DOE AFDC station 316457.
At a glance
Byers Chevrolet is a public EV charging station at 5887 N Meadows Drive in Grove City, Ohio, on the EV Connect network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Nov 1, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 316457 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 1, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5887 N Meadows Drive
- City
- Grove City
- State
- Ohio
- ZIP
- 43123
- Coordinates
- 39.84384, -83.08619
Within ~15 km
Nearby charging
- AEP - Unassigned Garage20 ports
PowerFlex · Available
- 195 E. Broad Street Garage13 ports
Flash · Available
- Google12 ports
ChargePoint · Available
Tesla Supercharger · Available
- Ohio Center Garage10 ports
Non-networked · Available
- The Electrical Trades Center10 ports
Blink · Available
What kind of charging does Byers Chevrolet offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Byers Chevrolet compare with other stations in Grove City?
Grove City has 14 charging stations in the DOE registry with 36 ports, the 20th-most of 326 cities and towns in Ohio. Byers Chevrolet accounts for 6% of the charging ports in Grove City. It is the only EV Connect station in Grove City. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Byers Chevrolet?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 46 of those stations are in Ohio, 2% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 1, 2023, one of 305 stations in Ohio with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Byers Chevrolet have?
Byers Chevrolet has 2 charging ports: 2 DC fast.
Does Byers Chevrolet have DC fast charging?
Yes. The registry lists 2 DC fast ports at Byers Chevrolet, with CCS connectors.
What connectors does Byers Chevrolet have?
Byers Chevrolet has CCS connectors.
Is Byers Chevrolet open to the public?
Yes. Byers Chevrolet is listed with public access, and its status is available.
Where is Byers Chevrolet?
Byers Chevrolet is at 5887 N Meadows Drive, Grove City, OH 43123. Its coordinates are 39.84384, -83.08619.
More EV charging around Grove City
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 316457, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Byers Chevrolet, Grove City, OH (AFDC station 316457)”, https://chargecensus.com/stations/ohio/byers-chevrolet-316457 (data as of October 12, 2026).