ChargeCensus

Brownhonda Station 2

Available

EV charging station in Toledo, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 448245.

At a glance

Brownhonda Station 2 is a public EV charging station at 5625 Central Avenue in Toledo, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 24, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID448245
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 24, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5625 Central Avenue
City
Toledo
State
Ohio
ZIP
43615
Coordinates
41.67587, -83.67672

Within ~15 km

Nearby charging

What kind of charging does Brownhonda Station 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Brownhonda Station 2 compare with other stations in Toledo?

Toledo has 48 charging stations in the DOE registry with 132 ports, the 5th-most of 326 cities and towns in Ohio. Brownhonda Station 2 accounts for under 1% of the charging ports in Toledo. ChargePoint runs 22 stations in Toledo. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Brownhonda Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 24, 2025, one of 319 stations in Ohio with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Brownhonda Station 2 have?

Brownhonda Station 2 has 1 charging port: 1 DC fast.

Does Brownhonda Station 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Brownhonda Station 2, with CHAdeMO and CCS connectors.

What connectors does Brownhonda Station 2 have?

Brownhonda Station 2 has CHAdeMO and CCS connectors.

Is Brownhonda Station 2 open to the public?

Yes. Brownhonda Station 2 is listed with public access, and its status is available.

Where is Brownhonda Station 2?

Brownhonda Station 2 is at 5625 Central Avenue, Toledo, OH 43615. Its coordinates are 41.67587, -83.67672.

More EV charging around Toledo

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 448245, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Brownhonda Station 2, Toledo, OH (AFDC station 448245)”, https://chargecensus.com/stations/ohio/brownhonda-station-2-448245 (data as of October 12, 2026).