ChargeCensus

Berger Hospital Berger 1

Available

EV charging station in Circleville, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 205322.

At a glance

Berger Hospital Berger 1 is a public EV charging station at 702 N Pickaway St in Circleville, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 26, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID205322
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 26, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
702 N Pickaway St
City
Circleville
State
Ohio
ZIP
43113
Coordinates
39.61112, -82.93706

Within ~15 km

Nearby charging

What kind of charging does Berger Hospital Berger 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Berger Hospital Berger 1 compare with other stations in Circleville?

Circleville has 4 charging stations in the DOE registry with 16 ports. Berger Hospital Berger 1 accounts for 13% of the charging ports in Circleville. ChargePoint runs 2 stations in Circleville. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Berger Hospital Berger 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 26, 2022, one of 345 stations in Ohio with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Berger Hospital Berger 1 have?

Berger Hospital Berger 1 has 2 charging ports: 2 Level 2.

Does Berger Hospital Berger 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Berger Hospital Berger 1 have?

Berger Hospital Berger 1 has J1772 connectors.

Is Berger Hospital Berger 1 open to the public?

Yes. Berger Hospital Berger 1 is listed with public access, and its status is available.

Where is Berger Hospital Berger 1?

Berger Hospital Berger 1 is at 702 N Pickaway St, Circleville, OH 43113. Its coordinates are 39.61112, -82.93706.

More EV charging around Circleville

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 205322, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Berger Hospital Berger 1, Circleville, OH (AFDC station 205322)”, https://chargecensus.com/stations/ohio/berger-hospital-berger-1-205322 (data as of October 12, 2026).