ChargeCensus

1250 Mead Rd

Available

EV charging station in Bellbrook, Ohio on the Loop network — 2 Level 2. US DOE AFDC station 463229.

At a glance

1250 Mead Rd is a public EV charging station at 1250 Mead Rd in Bellbrook, Ohio, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 11, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID463229
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateAug 11, 2025
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
1250 Mead Rd
City
Bellbrook
State
Ohio
ZIP
45305
Coordinates
39.65436, -84.03421

Within ~15 km

Nearby charging

What kind of charging does 1250 Mead Rd offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does 1250 Mead Rd compare with other stations in Bellbrook?

Bellbrook has 4 charging stations in the DOE registry with 14 ports. 1250 Mead Rd accounts for 14% of the charging ports in Bellbrook. It is the only Loop station in Bellbrook. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates 1250 Mead Rd?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 18 of those stations are in Ohio, under 1% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 11, 2025, one of 319 stations in Ohio with a 2025 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does 1250 Mead Rd have?

1250 Mead Rd has 2 charging ports: 2 Level 2.

Does 1250 Mead Rd have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 1250 Mead Rd have?

1250 Mead Rd has J1772 connectors.

Is 1250 Mead Rd open to the public?

Yes. 1250 Mead Rd is listed with public access, and its status is available.

Where is 1250 Mead Rd?

1250 Mead Rd is at 1250 Mead Rd, Bellbrook, OH 45305. Its coordinates are 39.65436, -84.03421.

More EV charging around Bellbrook

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 463229, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “1250 Mead Rd, Bellbrook, OH (AFDC station 463229)”, https://chargecensus.com/stations/ohio/1250-mead-rd-463229 (data as of October 12, 2026).