Puklich Chevrolet Buick GMC
AvailableEV charging station in Valley City, North Dakota on the Blink network — 2 DC fast. US DOE AFDC station 311266.
At a glance
Puklich Chevrolet Buick GMC is a public EV charging station at 721 W Main St. in Valley City, North Dakota, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Aug 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 311266 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 18, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 721 W Main St.
- City
- Valley City
- State
- North Dakota
- ZIP
- 58072
- Coordinates
- 46.92273, -98.01266
Within ~15 km
Nearby charging
- Stoudt Miller Ford2 ports
Red E · Available
- Stoudt-Ross Ford Inc1 ports
Non-networked · Available
What kind of charging does Puklich Chevrolet Buick GMC offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 22% below the North Dakota average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Puklich Chevrolet Buick GMC compare with other stations in Valley City?
Valley City has 3 charging stations in the DOE registry with 5 ports, the 12th-most of 24 cities and towns in North Dakota. Puklich Chevrolet Buick GMC accounts for 40% of the charging ports in Valley City. It is the only Blink station in Valley City. Statewide, North Dakota has 114 stations and 291 ports, the 50th-largest station count of the 51 states and DC. The biggest station in North Dakota, Fargo, ND - 45th Street South - Tesla Supercharger in Fargo, has 12 ports.
Who operates Puklich Chevrolet Buick GMC?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 7 of those stations are in North Dakota, 6% of the state's 114.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 18, 2023, one of 22 stations in North Dakota with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Puklich Chevrolet Buick GMC have?
Puklich Chevrolet Buick GMC has 2 charging ports: 2 DC fast.
Does Puklich Chevrolet Buick GMC have DC fast charging?
Yes. The registry lists 2 DC fast ports at Puklich Chevrolet Buick GMC, with CCS connectors.
What connectors does Puklich Chevrolet Buick GMC have?
Puklich Chevrolet Buick GMC has CCS connectors.
Is Puklich Chevrolet Buick GMC open to the public?
Yes. Puklich Chevrolet Buick GMC is listed with public access, and its status is available.
Where is Puklich Chevrolet Buick GMC?
Puklich Chevrolet Buick GMC is at 721 W Main St., Valley City, ND 58072. Its coordinates are 46.92273, -98.01266.
More EV charging around Valley City
Working with North Dakota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 311266, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Puklich Chevrolet Buick GMC, Valley City, ND (AFDC station 311266)”, https://chargecensus.com/stations/north-dakota/puklich-chevrolet-buick-gmc-311266 (data as of October 12, 2026).