Hillsboro Subway 250
AvailableEV charging station in Hillsboro, North Dakota on the ChargePoint network — 1 DC fast. US DOE AFDC station 213189.
At a glance
Hillsboro Subway 250 is a public EV charging station at 22 6th St NW in Hillsboro, North Dakota, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Apr 1, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 213189 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 1, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 22 6th St NW
- City
- Hillsboro
- State
- North Dakota
- ZIP
- 58045
- Coordinates
- 47.40342, -97.06978
Within ~15 km
Nearby charging
- Hillsboro Subway 40002 ports
ChargePoint · Available
What kind of charging does Hillsboro Subway 250 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 61% below the North Dakota average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Hillsboro Subway 250 compare with other stations in Hillsboro?
Hillsboro has 2 charging stations in the DOE registry with 3 ports, the 15th-most of 24 cities and towns in North Dakota. Hillsboro Subway 250 accounts for 33% of the charging ports in Hillsboro. ChargePoint runs 2 stations in Hillsboro. Statewide, North Dakota has 114 stations and 291 ports, the 50th-largest station count of the 51 states and DC. The biggest station in North Dakota, Fargo, ND - 45th Street South - Tesla Supercharger in Fargo, has 12 ports.
Who operates Hillsboro Subway 250?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 37 of those stations are in North Dakota, 32% of the state's 114.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 1, 2022, one of 8 stations in North Dakota with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hillsboro Subway 250 have?
Hillsboro Subway 250 has 1 charging port: 1 DC fast.
Does Hillsboro Subway 250 have DC fast charging?
Yes. The registry lists 1 DC fast port at Hillsboro Subway 250, with CHAdeMO and CCS connectors.
What connectors does Hillsboro Subway 250 have?
Hillsboro Subway 250 has CHAdeMO and CCS connectors.
Is Hillsboro Subway 250 open to the public?
Yes. Hillsboro Subway 250 is listed with public access, and its status is available.
Where is Hillsboro Subway 250?
Hillsboro Subway 250 is at 22 6th St NW, Hillsboro, ND 58045. Its coordinates are 47.40342, -97.06978.
More EV charging around Hillsboro
Working with North Dakota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 213189, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hillsboro Subway 250, Hillsboro, ND (AFDC station 213189)”, https://chargecensus.com/stations/north-dakota/hillsboro-subway-250-213189 (data as of October 12, 2026).