Wtcc Rtp Station 1
AvailableEV charging station in Morrisville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 316779.
At a glance
Wtcc Rtp Station 1 is a public EV charging station at 10908 Chapel Hill Rd in Morrisville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 7, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 316779 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 7, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 10908 Chapel Hill Rd
- City
- Morrisville
- State
- North Carolina
- ZIP
- 27560
- Coordinates
- 35.85358, -78.84005
Within ~15 km
Nearby charging
- The Novus39 ports
Noodoe · Available
- RTP Frontier30 ports
Non-networked · Available
Tesla Supercharger · Available
- MetLife - Cary - Building 216 ports
Non-networked · Available
- MetLife - Cary - Building 116 ports
Non-networked · Available
- Vintage Raleigh West14 ports
Blink · Available
What kind of charging does Wtcc Rtp Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Wtcc Rtp Station 1 compare with other stations in Morrisville?
Morrisville has 51 charging stations in the DOE registry with 171 ports, the 7th-most of 259 cities and towns in North Carolina. Wtcc Rtp Station 1 accounts for 1% of the charging ports in Morrisville. ChargePoint runs 32 stations in Morrisville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Wtcc Rtp Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 7, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Wtcc Rtp Station 1 have?
Wtcc Rtp Station 1 has 2 charging ports: 2 Level 2.
Does Wtcc Rtp Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Wtcc Rtp Station 1 have?
Wtcc Rtp Station 1 has J1772 connectors.
Is Wtcc Rtp Station 1 open to the public?
Yes. Wtcc Rtp Station 1 is listed with public access, and its status is available.
Where is Wtcc Rtp Station 1?
Wtcc Rtp Station 1 is at 10908 Chapel Hill Rd, Morrisville, NC 27560. Its coordinates are 35.85358, -78.84005.
More EV charging around Morrisville
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 316779, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Wtcc Rtp Station 1, Morrisville, NC (AFDC station 316779)”, https://chargecensus.com/stations/north-carolina/wtcc-rtp-station-1-316779 (data as of October 12, 2026).