Windsor Sta#1 Station 1
AvailableEV charging station in Windsor, North Carolina on the ChargePoint network — 1 DC fast. US DOE AFDC station 334332.
At a glance
Windsor Sta#1 Station 1 is a public EV charging station at 105 Queen Street in Windsor, North Carolina, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334332 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 1, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 105 Queen Street
- City
- Windsor
- State
- North Carolina
- ZIP
- 27983
- Coordinates
- 35.99825, -76.94768
Within ~15 km
Nearby charging
- Windsor Sta#1 Station21 ports
ChargePoint · Available
- Bill Clough Ford1 ports
Blink · Available
What kind of charging does Windsor Sta#1 Station 1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Windsor Sta#1 Station 1 compare with other stations in Windsor?
Windsor has 3 charging stations in the DOE registry with 3 ports. Windsor Sta#1 Station 1 accounts for 33% of the charging ports in Windsor. ChargePoint runs 2 stations in Windsor. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Windsor Sta#1 Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2024, one of 328 stations in North Carolina with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Windsor Sta#1 Station 1 have?
Windsor Sta#1 Station 1 has 1 charging port: 1 DC fast.
Does Windsor Sta#1 Station 1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Windsor Sta#1 Station 1, with CHAdeMO and CCS connectors.
What connectors does Windsor Sta#1 Station 1 have?
Windsor Sta#1 Station 1 has CHAdeMO and CCS connectors.
Is Windsor Sta#1 Station 1 open to the public?
Yes. Windsor Sta#1 Station 1 is listed with public access, and its status is available.
Where is Windsor Sta#1 Station 1?
Windsor Sta#1 Station 1 is at 105 Queen Street, Windsor, NC 27983. Its coordinates are 35.99825, -76.94768.
More EV charging around Windsor
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334332, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Windsor Sta#1 Station 1, Windsor, NC (AFDC station 334332)”, https://chargecensus.com/stations/north-carolina/windsor-sta-1-station-1-334332 (data as of October 12, 2026).