ChargeCensus

Wake Forest Parking Lot Q

Available

EV charging station in Winston-Salem, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 236799.

At a glance

Wake Forest Parking Lot Q is a public EV charging station at 1834 Wake Forest Rd. in Winston-Salem, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 1, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID236799
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 1, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1834 Wake Forest Rd.
ZIP
27109
Coordinates
36.13608, -80.28080

Within ~15 km

Nearby charging

What kind of charging does Wake Forest Parking Lot Q offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wake Forest Parking Lot Q compare with other stations in Winston-Salem?

Winston-Salem has 24 charging stations in the DOE registry with 88 ports, the 14th-most of 259 cities and towns in North Carolina. Wake Forest Parking Lot Q accounts for 2% of the charging ports in Winston-Salem. ChargePoint runs 14 stations in Winston-Salem. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Wake Forest Parking Lot Q?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 1, 2022, one of 201 stations in North Carolina with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wake Forest Parking Lot Q have?

Wake Forest Parking Lot Q has 2 charging ports: 2 Level 2.

Does Wake Forest Parking Lot Q have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wake Forest Parking Lot Q have?

Wake Forest Parking Lot Q has J1772 connectors.

Is Wake Forest Parking Lot Q open to the public?

Yes. Wake Forest Parking Lot Q is listed with public access, and its status is available.

Where is Wake Forest Parking Lot Q?

Wake Forest Parking Lot Q is at 1834 Wake Forest Rd., Winston-Salem, NC 27109. Its coordinates are 36.13608, -80.28080.

More EV charging around Winston-Salem

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 236799, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wake Forest Parking Lot Q, Winston-Salem, NC (AFDC station 236799)”, https://chargecensus.com/stations/north-carolina/wake-forest-parking-lot-q-236799 (data as of October 12, 2026).