Unioncounty Kia Uck Charger 2
AvailableEV charging station in Monroe, North Carolina on the ChargePoint network — 1 Level 2. US DOE AFDC station 202148.
At a glance
Unioncounty Kia Uck Charger 2 is a public EV charging station at 4712 W Hwy 74 in Monroe, North Carolina, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 8, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 202148 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 8, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4712 W Hwy 74
- City
- Monroe
- State
- North Carolina
- ZIP
- 28110
- Coordinates
- 35.04878, -80.61481
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Town and Country Ford10 ports
Red E · Available
- Paces Pointe6 ports
Loop · Available
- Fountains Matthews5 ports
Non-networked · Available
- Sun Valley4 ports
EV Connect · Available
Blink · Available
What kind of charging does Unioncounty Kia Uck Charger 2 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Unioncounty Kia Uck Charger 2 compare with other stations in Monroe?
Monroe has 9 charging stations in the DOE registry with 14 ports. Unioncounty Kia Uck Charger 2 accounts for 7% of the charging ports in Monroe. ChargePoint runs 7 stations in Monroe. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Unioncounty Kia Uck Charger 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 8, 2021, one of 252 stations in North Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Unioncounty Kia Uck Charger 2 have?
Unioncounty Kia Uck Charger 2 has 1 charging port: 1 Level 2.
Does Unioncounty Kia Uck Charger 2 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Unioncounty Kia Uck Charger 2 have?
Unioncounty Kia Uck Charger 2 has J1772 connectors.
Is Unioncounty Kia Uck Charger 2 open to the public?
Yes. Unioncounty Kia Uck Charger 2 is listed with public access, and its status is available.
Where is Unioncounty Kia Uck Charger 2?
Unioncounty Kia Uck Charger 2 is at 4712 W Hwy 74, Monroe, NC 28110. Its coordinates are 35.04878, -80.61481.
More EV charging around Monroe
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 202148, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Unioncounty Kia Uck Charger 2, Monroe, NC (AFDC station 202148)”, https://chargecensus.com/stations/north-carolina/unioncounty-kia-uck-charger-2-202148 (data as of October 12, 2026).