ChargeCensus

Town Triangle Afpqo000000mdat

Available

EV charging station in Raleigh, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 360825.

At a glance

Town Triangle Afpqo000000mdat is a public EV charging station at 7801 Cheaha Dr in Raleigh, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 26, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID360825
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 26, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7801 Cheaha Dr
ZIP
27616
Coordinates
35.87174, -78.56833

Within ~15 km

Nearby charging

What kind of charging does Town Triangle Afpqo000000mdat offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Town Triangle Afpqo000000mdat compare with other stations in Raleigh?

Raleigh has 218 charging stations in the DOE registry with 584 ports, the 2nd-most of 259 cities and towns in North Carolina. Town Triangle Afpqo000000mdat accounts for under 1% of the charging ports in Raleigh. ChargePoint runs 135 stations in Raleigh. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Town Triangle Afpqo000000mdat?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 26, 2024, one of 328 stations in North Carolina with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Town Triangle Afpqo000000mdat have?

Town Triangle Afpqo000000mdat has 2 charging ports: 2 Level 2.

Does Town Triangle Afpqo000000mdat have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Town Triangle Afpqo000000mdat have?

Town Triangle Afpqo000000mdat has J1772 connectors.

Is Town Triangle Afpqo000000mdat open to the public?

Yes. Town Triangle Afpqo000000mdat is listed with public access, and its status is available.

Where is Town Triangle Afpqo000000mdat?

Town Triangle Afpqo000000mdat is at 7801 Cheaha Dr, Raleigh, NC 27616. Its coordinates are 35.87174, -78.56833.

More EV charging around Raleigh

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 360825, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Town Triangle Afpqo000000mdat, Raleigh, NC (AFDC station 360825)”, https://chargecensus.com/stations/north-carolina/town-triangle-afpqo000000mdat-360825 (data as of October 12, 2026).