Town Creek Parking Lot #1
AvailableEV charging station in Beaufort, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 222861.
At a glance
Town Creek Parking Lot #1 is a public EV charging station at 114 Town Creek Drive in Beaufort, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 8, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 222861 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 8, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 114 Town Creek Drive
- City
- Beaufort
- State
- North Carolina
- ZIP
- 28516
- Coordinates
- 34.72657, -76.66431
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Sand Piper Motel6 ports
EnviroSpark · Available
Tesla Destination · Available
- SFO Fort Macon4 ports
Non-networked · Available
- Ucf On Bridges Ucf2 ports
ChargePoint · Available
Tesla Destination · Available
What kind of charging does Town Creek Parking Lot #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Town Creek Parking Lot #1 compare with other stations in Beaufort?
Beaufort has 4 charging stations in the DOE registry with 7 ports. Town Creek Parking Lot #1 accounts for 29% of the charging ports in Beaufort. It is the only ChargePoint station in Beaufort. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Town Creek Parking Lot #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 8, 2022, one of 201 stations in North Carolina with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Town Creek Parking Lot #1 have?
Town Creek Parking Lot #1 has 2 charging ports: 2 Level 2.
Does Town Creek Parking Lot #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Town Creek Parking Lot #1 have?
Town Creek Parking Lot #1 has J1772 connectors.
Is Town Creek Parking Lot #1 open to the public?
Yes. Town Creek Parking Lot #1 is listed with public access, and its status is available.
Where is Town Creek Parking Lot #1?
Town Creek Parking Lot #1 is at 114 Town Creek Drive, Beaufort, NC 28516. Its coordinates are 34.72657, -76.66431.
More EV charging around Beaufort
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 222861, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Town Creek Parking Lot #1, Beaufort, NC (AFDC station 222861)”, https://chargecensus.com/stations/north-carolina/town-creek-parking-lot-1-222861 (data as of October 12, 2026).