The Piedmont Bldg 6
AvailableEV charging station in Raleigh, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 350077.
At a glance
The Piedmont Bldg 6 is a public EV charging station at 7611 Piedmont Ridge Cir in Raleigh, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 8, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 350077 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 8, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7611 Piedmont Ridge Cir
- City
- Raleigh
- State
- North Carolina
- ZIP
- 27616
- Coordinates
- 35.86846, -78.57064
Within ~15 km
Nearby charging
- Raleigh, NC - Tesla Supercharger24 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- City of Raleigh - Transit Center12 ports
Non-networked · Available
Tesla Supercharger · Available
- 4401 Lakerim Ave11 ports
Blink · Available
Electrify America · Available
What kind of charging does The Piedmont Bldg 6 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Piedmont Bldg 6 compare with other stations in Raleigh?
Raleigh has 218 charging stations in the DOE registry with 584 ports, the 2nd-most of 259 cities and towns in North Carolina. The Piedmont Bldg 6 accounts for under 1% of the charging ports in Raleigh. ChargePoint runs 135 stations in Raleigh. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates The Piedmont Bldg 6?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 8, 2024, one of 328 stations in North Carolina with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Piedmont Bldg 6 have?
The Piedmont Bldg 6 has 2 charging ports: 2 Level 2.
Does The Piedmont Bldg 6 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Piedmont Bldg 6 have?
The Piedmont Bldg 6 has J1772 connectors.
Is The Piedmont Bldg 6 open to the public?
Yes. The Piedmont Bldg 6 is listed with public access, and its status is available.
Where is The Piedmont Bldg 6?
The Piedmont Bldg 6 is at 7611 Piedmont Ridge Cir, Raleigh, NC 27616. Its coordinates are 35.86846, -78.57064.
More EV charging around Raleigh
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 350077, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Piedmont Bldg 6, Raleigh, NC (AFDC station 350077)”, https://chargecensus.com/stations/north-carolina/the-piedmont-bldg-6-350077 (data as of October 12, 2026).