ChargeCensus

The Links South The Links-1

Available

EV charging station in Charlotte, North Carolina on the ChargePoint network — 1 Level 2. US DOE AFDC station 462159.

At a glance

The Links South The Links-1 is a public EV charging station at 7219 S Rea Park Lane in Charlotte, North Carolina, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 25, 2026.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID462159
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 25, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7219 S Rea Park Lane
ZIP
28277
Coordinates
35.05132, -80.77486

Within ~15 km

Nearby charging

What kind of charging does The Links South The Links-1 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does The Links South The Links-1 compare with other stations in Charlotte?

Charlotte has 303 charging stations in the DOE registry with 1,039 ports, the most of 259 cities and towns in North Carolina. The Links South The Links-1 accounts for under 1% of the charging ports in Charlotte. ChargePoint runs 173 stations in Charlotte. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates The Links South The Links-1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 25, 2026, one of 155 stations in North Carolina with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Links South The Links-1 have?

The Links South The Links-1 has 1 charging port: 1 Level 2.

Does The Links South The Links-1 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does The Links South The Links-1 have?

The Links South The Links-1 has J1772 connectors.

Is The Links South The Links-1 open to the public?

Yes. The Links South The Links-1 is listed with public access, and its status is available.

Where is The Links South The Links-1?

The Links South The Links-1 is at 7219 S Rea Park Lane, Charlotte, NC 28277. Its coordinates are 35.05132, -80.77486.

More EV charging around Charlotte

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 462159, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Links South The Links-1, Charlotte, NC (AFDC station 462159)”, https://chargecensus.com/stations/north-carolina/the-links-south-the-links-1-462159 (data as of October 12, 2026).