Tall Oaks Station 1
AvailableEV charging station in Greensboro, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 313685.
At a glance
Tall Oaks Station 1 is a public EV charging station at 115 Tall Oaks Dr in Greensboro, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 14, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 313685 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 14, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 115 Tall Oaks Dr
- City
- Greensboro
- State
- North Carolina
- ZIP
- 27455
- Coordinates
- 36.12174, -79.82831
Within ~15 km
Nearby charging
- Campus Greensboro16 ports
Blink · Available
Tesla Supercharger · Available
- Eugene Street Deck15 ports
Non-networked · Available
- Target T1180 (Greensboro, NC)12 ports
Electrify America · Available
Mercedes-Benz HPC · Available
Tesla Destination · Available
What kind of charging does Tall Oaks Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Tall Oaks Station 1 compare with other stations in Greensboro?
Greensboro has 51 charging stations in the DOE registry with 200 ports, the 6th-most of 259 cities and towns in North Carolina. Tall Oaks Station 1 accounts for 1% of the charging ports in Greensboro. ChargePoint runs 28 stations in Greensboro. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Tall Oaks Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 14, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Tall Oaks Station 1 have?
Tall Oaks Station 1 has 2 charging ports: 2 Level 2.
Does Tall Oaks Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Tall Oaks Station 1 have?
Tall Oaks Station 1 has J1772 connectors.
Is Tall Oaks Station 1 open to the public?
Yes. Tall Oaks Station 1 is listed with public access, and its status is available.
Where is Tall Oaks Station 1?
Tall Oaks Station 1 is at 115 Tall Oaks Dr, Greensboro, NC 27455. Its coordinates are 36.12174, -79.82831.
More EV charging around Greensboro
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 313685, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tall Oaks Station 1, Greensboro, NC (AFDC station 313685)”, https://chargecensus.com/stations/north-carolina/tall-oaks-station-1-313685 (data as of October 12, 2026).