Syemc Station1
AvailableEV charging station in Dobson, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 189790.
At a glance
Syemc Station1 is a public EV charging station at 110 Frank Comer Blvd in Dobson, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 19, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 189790 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 19, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 110 Frank Comer Blvd
- City
- Dobson
- State
- North Carolina
- ZIP
- 27017
- Coordinates
- 36.38541, -80.71906
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Flying J Travel Center 5494 ports
EVgo · Available
- CircleK-Dobson, CA4 ports
Circle K Charge · Available
- Syemc Starbucks2 ports
ChargePoint · Available
EV Connect · Available
What kind of charging does Syemc Station1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Syemc Station1 compare with other stations in Dobson?
Dobson has 5 charging stations in the DOE registry with 12 ports. Syemc Station1 accounts for 17% of the charging ports in Dobson. ChargePoint runs 4 stations in Dobson. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Syemc Station1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 19, 2021, one of 252 stations in North Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Syemc Station1 have?
Syemc Station1 has 2 charging ports: 2 Level 2.
Does Syemc Station1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Syemc Station1 have?
Syemc Station1 has J1772 connectors.
Is Syemc Station1 open to the public?
Yes. Syemc Station1 is listed with public access, and its status is available.
Where is Syemc Station1?
Syemc Station1 is at 110 Frank Comer Blvd, Dobson, NC 27017. Its coordinates are 36.38541, -80.71906.
More EV charging around Dobson
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 189790, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Syemc Station1, Dobson, NC (AFDC station 189790)”, https://chargecensus.com/stations/north-carolina/syemc-station1-189790 (data as of October 12, 2026).