ChargeCensus

Revup1 Nc Zoo2

Available

EV charging station in Asheboro, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 96720.

At a glance

Revup1 Nc Zoo2 is a public EV charging station at Zoo Pkwy in Asheboro, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 21, 2018.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID96720
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 21, 2018
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
Zoo Pkwy
ZIP
27205
Coordinates
35.63045, -79.76558

Within ~15 km

Nearby charging

What kind of charging does Revup1 Nc Zoo2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Revup1 Nc Zoo2 compare with other stations in Asheboro?

Asheboro has 13 charging stations in the DOE registry with 24 ports. Revup1 Nc Zoo2 accounts for 8% of the charging ports in Asheboro. ChargePoint runs 10 stations in Asheboro. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Revup1 Nc Zoo2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 21, 2018, one of 52 stations in North Carolina with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Revup1 Nc Zoo2 have?

Revup1 Nc Zoo2 has 2 charging ports: 2 Level 2.

Does Revup1 Nc Zoo2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Revup1 Nc Zoo2 have?

Revup1 Nc Zoo2 has J1772 connectors.

Is Revup1 Nc Zoo2 open to the public?

Yes. Revup1 Nc Zoo2 is listed with public access, and its status is available.

Where is Revup1 Nc Zoo2?

Revup1 Nc Zoo2 is at Zoo Pkwy, Asheboro, NC 27205. Its coordinates are 35.63045, -79.76558.

More EV charging around Asheboro

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 96720, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Revup1 Nc Zoo2, Asheboro, NC (AFDC station 96720)”, https://chargecensus.com/stations/north-carolina/revup1-nc-zoo2-96720 (data as of October 12, 2026).