Pure Power Contractors
AvailableEV charging station in Monroe, North Carolina on the EV Connect network — 1 DC fast. US DOE AFDC station 190265.
At a glance
Pure Power Contractors is a public EV charging station at 2812 Gray Fox Rd in Monroe, North Carolina, on the EV Connect network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 18, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 190265 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2812 Gray Fox Rd
- City
- Monroe
- State
- North Carolina
- ZIP
- 28110
- Coordinates
- 35.05778, -80.62023
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Town and Country Ford10 ports
Red E · Available
- Paces Pointe6 ports
Loop · Available
- Fountains Matthews5 ports
Non-networked · Available
- Sun Valley4 ports
EV Connect · Available
Blink · Available
What kind of charging does Pure Power Contractors offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Pure Power Contractors compare with other stations in Monroe?
Monroe has 9 charging stations in the DOE registry with 14 ports. Pure Power Contractors accounts for 7% of the charging ports in Monroe. It is the only EV Connect station in Monroe. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Pure Power Contractors?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 74 of those stations are in North Carolina, 4% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2021, one of 252 stations in North Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pure Power Contractors have?
Pure Power Contractors has 1 charging port: 1 DC fast.
Does Pure Power Contractors have DC fast charging?
Yes. The registry lists 1 DC fast port at Pure Power Contractors, with CHAdeMO and CCS connectors.
What connectors does Pure Power Contractors have?
Pure Power Contractors has CHAdeMO and CCS connectors.
Is Pure Power Contractors open to the public?
Yes. Pure Power Contractors is listed with public access, and its status is available.
Where is Pure Power Contractors?
Pure Power Contractors is at 2812 Gray Fox Rd, Monroe, NC 28110. Its coordinates are 35.05778, -80.62023.
More EV charging around Monroe
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 190265, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pure Power Contractors, Monroe, NC (AFDC station 190265)”, https://chargecensus.com/stations/north-carolina/pure-power-contractors-190265 (data as of October 12, 2026).