Pier 33 Pd Level G
AvailableEV charging station in Wilmington, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 189668.
At a glance
Pier 33 Pd Level G is a public EV charging station at 901 Nutt St in Wilmington, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 14, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 189668 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 14, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 901 Nutt St
- City
- Wilmington
- State
- North Carolina
- ZIP
- 28401
- Coordinates
- 34.24541, -77.95095
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Leland, NC - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- The Range8 ports
ChargeUp · Available
- Capital Ford Wilmington7 ports
Blink · Available
Electrify America · Available
What kind of charging does Pier 33 Pd Level G offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pier 33 Pd Level G compare with other stations in Wilmington?
Wilmington has 39 charging stations in the DOE registry with 107 ports, the 8th-most of 259 cities and towns in North Carolina. Pier 33 Pd Level G accounts for 2% of the charging ports in Wilmington. ChargePoint runs 13 stations in Wilmington. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Pier 33 Pd Level G?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 14, 2021, one of 252 stations in North Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pier 33 Pd Level G have?
Pier 33 Pd Level G has 2 charging ports: 2 Level 2.
Does Pier 33 Pd Level G have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pier 33 Pd Level G have?
Pier 33 Pd Level G has J1772 connectors.
Is Pier 33 Pd Level G open to the public?
Yes. Pier 33 Pd Level G is listed with public access, and its status is available.
Where is Pier 33 Pd Level G?
Pier 33 Pd Level G is at 901 Nutt St, Wilmington, NC 28401. Its coordinates are 34.24541, -77.95095.
More EV charging around Wilmington
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 189668, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pier 33 Pd Level G, Wilmington, NC (AFDC station 189668)”, https://chargecensus.com/stations/north-carolina/pier-33-pd-level-g-189668 (data as of October 12, 2026).