ChargeCensus

Part Dc250 1

Available

EV charging station in Graham, North Carolina on the ChargePoint network — 1 DC fast. US DOE AFDC station 201065.

At a glance

Part Dc250 1 is a public EV charging station at 824 N Main St in Graham, North Carolina, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Nov 13, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID201065
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 13, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
824 N Main St
City
Graham
ZIP
27253
Coordinates
36.05667, -79.39913

Within ~15 km

Nearby charging

What kind of charging does Part Dc250 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Part Dc250 1 compare with other stations in Graham?

Graham has 6 charging stations in the DOE registry with 25 ports. Part Dc250 1 accounts for 4% of the charging ports in Graham. ChargePoint runs 2 stations in Graham. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Part Dc250 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 13, 2021, one of 252 stations in North Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Part Dc250 1 have?

Part Dc250 1 has 1 charging port: 1 DC fast.

Does Part Dc250 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Part Dc250 1, with CHAdeMO and CCS connectors.

What connectors does Part Dc250 1 have?

Part Dc250 1 has CHAdeMO and CCS connectors.

Is Part Dc250 1 open to the public?

Yes. Part Dc250 1 is listed with public access, and its status is available.

Where is Part Dc250 1?

Part Dc250 1 is at 824 N Main St, Graham, NC 27253. Its coordinates are 36.05667, -79.39913.

More EV charging around Graham

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 201065, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Part Dc250 1, Graham, NC (AFDC station 201065)”, https://chargecensus.com/stations/north-carolina/part-dc250-1-201065 (data as of October 12, 2026).