Ingles Market
AvailableEV charging station in Waynesville, North Carolina, not on a charging network — 2 Level 2. US DOE AFDC station 91903.
At a glance
Ingles Market is a public EV charging station at 1670 Brown Ave in Waynesville, North Carolina, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 1, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 91903 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Grocery store |
| Open date | Jan 1, 2018 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 1670 Brown Ave
- City
- Waynesville
- State
- North Carolina
- ZIP
- 28786
- Coordinates
- 35.47014, -83.00487
Within ~15 km
Nearby charging
- Pilot Travel Center 3935 ports
EVgo · Available
- Ingles Market4 ports
Non-networked · Available
- 88 Montgomery St Parking Lot4 ports
EV Connect · Available
- Maggie Valley Cabin Rentals2 ports
Rivian Waypoints · Available
- Recreation Center2 ports
EV Connect · Available
EV Connect · Available
What kind of charging does Ingles Market offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a grocery store location.
How does Ingles Market compare with other stations in Waynesville?
Waynesville has 12 charging stations in the DOE registry with 26 ports. Ingles Market accounts for 8% of the charging ports in Waynesville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Ingles Market?
Ingles Market is listed as non-networked: its chargers are not run through a charging-network account. North Carolina has 247 non-networked stations, 12% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 1, 2018, one of 52 stations in North Carolina with a 2018 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Ingles Market have?
Ingles Market has 2 charging ports: 2 Level 2.
Does Ingles Market have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ingles Market have?
Ingles Market has J1772 connectors.
Is charging at Ingles Market free?
Pricing as reported to the DOE registry: Free.
Is Ingles Market open to the public?
Yes. Ingles Market is listed with public access, and its status is available.
Where is Ingles Market?
Ingles Market is at 1670 Brown Ave, Waynesville, NC 28786. Its coordinates are 35.47014, -83.00487.
More EV charging around Waynesville
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 91903, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ingles Market, Waynesville, NC (AFDC station 91903)”, https://chargecensus.com/stations/north-carolina/ingles-market-91903 (data as of October 12, 2026).