Hampton Inn Spring Lake - Fayetteville
AvailableEV charging station in Spring Lake, North Carolina on the Loop network — 2 Level 2. US DOE AFDC station 463228.
At a glance
Hampton Inn Spring Lake - Fayetteville is a public EV charging station at 1050 N Bragg Blvd in Spring Lake, North Carolina, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 463228 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Feb 18, 2026 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1050 N Bragg Blvd
- City
- Spring Lake
- State
- North Carolina
- ZIP
- 28390
- Coordinates
- 35.17964, -78.97952
Within ~15 km
Nearby charging
- Fort Bragg138 ports
Non-networked · Available
Blink · Available
Electrify America · Available
- Liberty Ford4 ports
Ford Charge · Available
Blink · Available
- Lafayette Ford4 ports
Ford Charge · Available
What kind of charging does Hampton Inn Spring Lake - Fayetteville offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does Hampton Inn Spring Lake - Fayetteville compare with other stations in Spring Lake?
Spring Lake has 1 charging station in the DOE registry with 2 ports. It is the only Loop station in Spring Lake. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Hampton Inn Spring Lake - Fayetteville?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 43 of those stations are in North Carolina, 2% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 18, 2026, one of 155 stations in North Carolina with a 2026 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does Hampton Inn Spring Lake - Fayetteville have?
Hampton Inn Spring Lake - Fayetteville has 2 charging ports: 2 Level 2.
Does Hampton Inn Spring Lake - Fayetteville have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Hampton Inn Spring Lake - Fayetteville have?
Hampton Inn Spring Lake - Fayetteville has J1772 connectors.
Is Hampton Inn Spring Lake - Fayetteville open to the public?
Yes. Hampton Inn Spring Lake - Fayetteville is listed with public access, and its status is available.
Where is Hampton Inn Spring Lake - Fayetteville?
Hampton Inn Spring Lake - Fayetteville is at 1050 N Bragg Blvd, Spring Lake, NC 28390. Its coordinates are 35.17964, -78.97952.
More EV charging around Spring Lake
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 463228, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hampton Inn Spring Lake - Fayetteville, Spring Lake, NC (AFDC station 463228)”, https://chargecensus.com/stations/north-carolina/hampton-inn-spring-lake-fayetteville-463228 (data as of October 12, 2026).