Granger Village Building 3
AvailableEV charging station in Mooresville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 261289.
At a glance
Granger Village Building 3 is a public EV charging station at 144 Red Rock Rd in Mooresville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 24, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 261289 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 24, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 144 Red Rock Rd
- City
- Mooresville
- State
- North Carolina
- ZIP
- 28117
- Coordinates
- 35.55746, -80.85073
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Solis Birkdale10 ports
Blink · Available
Tesla Destination · Available
Tesla Destination · Available
Tesla Destination · Available
What kind of charging does Granger Village Building 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Granger Village Building 3 compare with other stations in Mooresville?
Mooresville has 16 charging stations in the DOE registry with 45 ports, the 18th-most of 259 cities and towns in North Carolina. Granger Village Building 3 accounts for 4% of the charging ports in Mooresville. ChargePoint runs 8 stations in Mooresville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Granger Village Building 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 24, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Granger Village Building 3 have?
Granger Village Building 3 has 2 charging ports: 2 Level 2.
Does Granger Village Building 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Granger Village Building 3 have?
Granger Village Building 3 has J1772 connectors.
Is Granger Village Building 3 open to the public?
Yes. Granger Village Building 3 is listed with public access, and its status is available.
Where is Granger Village Building 3?
Granger Village Building 3 is at 144 Red Rock Rd, Mooresville, NC 28117. Its coordinates are 35.55746, -80.85073.
More EV charging around Mooresville
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 261289, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Granger Village Building 3, Mooresville, NC (AFDC station 261289)”, https://chargecensus.com/stations/north-carolina/granger-village-building-3-261289 (data as of October 12, 2026).