Gov Annex Countyofanson
AvailableEV charging station in Wadesboro, North Carolina on the ChargePoint network — 1 DC fast. US DOE AFDC station 307327.
At a glance
Gov Annex Countyofanson is a public EV charging station at 575 US-52 in Wadesboro, North Carolina, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 17, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 307327 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 17, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 575 US-52
- City
- Wadesboro
- State
- North Carolina
- ZIP
- 28170
- Coordinates
- 34.95578, -80.05947
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Gov Annex Countyofanson offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Gov Annex Countyofanson compare with other stations in Wadesboro?
Wadesboro has 1 charging station in the DOE registry with 1 ports. It is the only ChargePoint station in Wadesboro. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Gov Annex Countyofanson?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 17, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gov Annex Countyofanson have?
Gov Annex Countyofanson has 1 charging port: 1 DC fast.
Does Gov Annex Countyofanson have DC fast charging?
Yes. The registry lists 1 DC fast port at Gov Annex Countyofanson, with CHAdeMO and CCS connectors.
What connectors does Gov Annex Countyofanson have?
Gov Annex Countyofanson has CHAdeMO and CCS connectors.
Is Gov Annex Countyofanson open to the public?
Yes. Gov Annex Countyofanson is listed with public access, and its status is available.
Where is Gov Annex Countyofanson?
Gov Annex Countyofanson is at 575 US-52, Wadesboro, NC 28170. Its coordinates are 34.95578, -80.05947.
More EV charging around Wadesboro
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 307327, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gov Annex Countyofanson, Wadesboro, NC (AFDC station 307327)”, https://chargecensus.com/stations/north-carolina/gov-annex-countyofanson-307327 (data as of October 12, 2026).