Four Farms Station 2
AvailableEV charging station in Greensboro, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 315784.
At a glance
Four Farms Station 2 is a public EV charging station at 2901 Belterra Cir in Greensboro, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 25, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 315784 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 25, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2901 Belterra Cir
- City
- Greensboro
- State
- North Carolina
- ZIP
- 27410
- Coordinates
- 36.14603, -79.87192
Within ~15 km
Nearby charging
- Campus Greensboro16 ports
Blink · Available
Tesla Supercharger · Available
- Eugene Street Deck15 ports
Non-networked · Available
- Target T1180 (Greensboro, NC)12 ports
Electrify America · Available
Mercedes-Benz HPC · Available
Tesla Destination · Available
What kind of charging does Four Farms Station 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Four Farms Station 2 compare with other stations in Greensboro?
Greensboro has 51 charging stations in the DOE registry with 200 ports, the 6th-most of 259 cities and towns in North Carolina. Four Farms Station 2 accounts for 1% of the charging ports in Greensboro. ChargePoint runs 28 stations in Greensboro. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Four Farms Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 25, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Four Farms Station 2 have?
Four Farms Station 2 has 2 charging ports: 2 Level 2.
Does Four Farms Station 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Four Farms Station 2 have?
Four Farms Station 2 has J1772 connectors.
Is Four Farms Station 2 open to the public?
Yes. Four Farms Station 2 is listed with public access, and its status is available.
Where is Four Farms Station 2?
Four Farms Station 2 is at 2901 Belterra Cir, Greensboro, NC 27410. Its coordinates are 36.14603, -79.87192.
More EV charging around Greensboro
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 315784, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Four Farms Station 2, Greensboro, NC (AFDC station 315784)”, https://chargecensus.com/stations/north-carolina/four-farms-station-2-315784 (data as of October 12, 2026).