Eno River Parking Deck
AvailableEV charging station in Hillsborough, North Carolina, not on a charging network — 11 Level 2. US DOE AFDC station 50393.
At a glance
Eno River Parking Deck is a public EV charging station at 106 Nash and Kollock St in Hillsborough, North Carolina, not attached to a charging network. It has 11 charging ports (11 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 12, 2012.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 50393 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | May 12, 2012 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 106 Nash and Kollock St
- City
- Hillsborough
- State
- North Carolina
- ZIP
- 27278
- Coordinates
- 36.07362, -79.10021
Within ~15 km
Nearby charging
- 900 Willow16 ports
Blink · Available
- Durham, NC - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- University Pines6 ports
Loop · Available
Non-networked · Available
- SWTCH Energy Inc.4 ports
SWTCH · Available
What kind of charging does Eno River Parking Deck offer?
Of its 11 ports, 11 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.5 times the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a parking lot location.
How does Eno River Parking Deck compare with other stations in Hillsborough?
Hillsborough has 8 charging stations in the DOE registry with 31 ports. Eno River Parking Deck accounts for 35% of the charging ports in Hillsborough. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Eno River Parking Deck?
Eno River Parking Deck is listed as non-networked: its chargers are not run through a charging-network account. North Carolina has 247 non-networked stations, 12% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 12, 2012, one of 50 stations in North Carolina with a 2012 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Eno River Parking Deck have?
Eno River Parking Deck has 11 charging ports: 11 Level 2.
Does Eno River Parking Deck have DC fast charging?
No. The registry lists no DC fast ports here; its 11 ports are all Level 2.
What connectors does Eno River Parking Deck have?
Eno River Parking Deck has J1772 connectors.
Is charging at Eno River Parking Deck free?
Pricing as reported to the DOE registry: Free.
Is Eno River Parking Deck open to the public?
Yes. Eno River Parking Deck is listed with public access, and its status is available.
Where is Eno River Parking Deck?
Eno River Parking Deck is at 106 Nash and Kollock St, Hillsborough, NC 27278. Its coordinates are 36.07362, -79.10021.
More EV charging around Hillsborough
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 50393, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Eno River Parking Deck, Hillsborough, NC (AFDC station 50393)”, https://chargecensus.com/stations/north-carolina/eno-river-parking-deck-50393 (data as of October 12, 2026).