Ecu Austin Building
AvailableEV charging station in Greenville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 92451.
At a glance
Ecu Austin Building is a public EV charging station at Dixon Dr in Greenville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 7, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 92451 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 7, 2018 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- Dixon Dr
- City
- Greenville
- State
- North Carolina
- ZIP
- 27858
- Coordinates
- 35.60577, -77.36235
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Blink · Available
Blink · Available
- Legacy at Firetower2 ports
Blink · Available
- Kinetic Physical Therapy2 ports
EVmatch · Available
ChargePoint · Available
What kind of charging does Ecu Austin Building offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ecu Austin Building compare with other stations in Greenville?
Greenville has 29 charging stations in the DOE registry with 63 ports, the 11th-most of 259 cities and towns in North Carolina. Ecu Austin Building accounts for 3% of the charging ports in Greenville. ChargePoint runs 20 stations in Greenville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Ecu Austin Building?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 7, 2018, one of 52 stations in North Carolina with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ecu Austin Building have?
Ecu Austin Building has 2 charging ports: 2 Level 2.
Does Ecu Austin Building have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ecu Austin Building have?
Ecu Austin Building has J1772 connectors.
Is Ecu Austin Building open to the public?
Yes. Ecu Austin Building is listed with public access, and its status is available.
Where is Ecu Austin Building?
Ecu Austin Building is at Dixon Dr, Greenville, NC 27858. Its coordinates are 35.60577, -77.36235.
More EV charging around Greenville
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 92451, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ecu Austin Building, Greenville, NC (AFDC station 92451)”, https://chargecensus.com/stations/north-carolina/ecu-austin-building-92451 (data as of October 12, 2026).