Corev Moore Square 1
AvailableEV charging station in Raleigh, North Carolina on the ChargePoint network — 1 Level 2. US DOE AFDC station 150317.
At a glance
Corev Moore Square 1 is a public EV charging station at 233 S Wilmington Street in Raleigh, North Carolina, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 18, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 150317 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 18, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 233 S Wilmington Street
- City
- Raleigh
- State
- North Carolina
- ZIP
- 27601
- Coordinates
- 35.77716, -78.63770
Within ~15 km
Nearby charging
- Raleigh, NC - Tesla Supercharger24 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Vintage Raleigh West14 ports
Blink · Available
Tesla Supercharger · Available
- City of Raleigh - Transit Center12 ports
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does Corev Moore Square 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 68% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Corev Moore Square 1 compare with other stations in Raleigh?
Raleigh has 218 charging stations in the DOE registry with 584 ports, the 2nd-most of 259 cities and towns in North Carolina. Corev Moore Square 1 accounts for under 1% of the charging ports in Raleigh. ChargePoint runs 135 stations in Raleigh. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Corev Moore Square 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2019, one of 78 stations in North Carolina with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Corev Moore Square 1 have?
Corev Moore Square 1 has 1 charging port: 1 Level 2.
Does Corev Moore Square 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Corev Moore Square 1 have?
Corev Moore Square 1 has J1772 connectors.
Is Corev Moore Square 1 open to the public?
Yes. Corev Moore Square 1 is listed with public access, and its status is available.
Where is Corev Moore Square 1?
Corev Moore Square 1 is at 233 S Wilmington Street, Raleigh, NC 27601. Its coordinates are 35.77716, -78.63770.
More EV charging around Raleigh
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 150317, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Corev Moore Square 1, Raleigh, NC (AFDC station 150317)”, https://chargecensus.com/stations/north-carolina/corev-moore-square-1-150317 (data as of October 12, 2026).