ChargeCensus

Caveness Farms Apts

Available

EV charging station in Wake Forest, North Carolina on the Loop network — 6 Level 2. US DOE AFDC station 399645.

At a glance

Caveness Farms Apts is a public EV charging station at 1760 Pasture Walk Dr in Wake Forest, North Carolina, on the Loop network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 18, 2023.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID399645
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateSep 18, 2023
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
1760 Pasture Walk Dr
ZIP
27587
Coordinates
35.96031, -78.53767

Within ~15 km

Nearby charging

What kind of charging does Caveness Farms Apts offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does Caveness Farms Apts compare with other stations in Wake Forest?

Wake Forest has 15 charging stations in the DOE registry with 51 ports, the 22nd-most of 259 cities and towns in North Carolina. Caveness Farms Apts accounts for 12% of the charging ports in Wake Forest. It is the only Loop station in Wake Forest. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Caveness Farms Apts?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 43 of those stations are in North Carolina, 2% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does Caveness Farms Apts have?

Caveness Farms Apts has 6 charging ports: 6 Level 2.

Does Caveness Farms Apts have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Caveness Farms Apts have?

Caveness Farms Apts has J1772 connectors.

Is Caveness Farms Apts open to the public?

Yes. Caveness Farms Apts is listed with public access, and its status is available.

Where is Caveness Farms Apts?

Caveness Farms Apts is at 1760 Pasture Walk Dr, Wake Forest, NC 27587. Its coordinates are 35.96031, -78.53767.

More EV charging around Wake Forest

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 399645, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Caveness Farms Apts, Wake Forest, NC (AFDC station 399645)”, https://chargecensus.com/stations/north-carolina/caveness-farms-apts-399645 (data as of October 12, 2026).