Asana Design Center
AvailableEV charging station in Charlotte, North Carolina on the EnviroSpark network — 2 Level 2. US DOE AFDC station 438031.
At a glance
Asana Design Center is a public EV charging station at 1930 Camden Rd in Charlotte, North Carolina, on the EnviroSpark network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 30, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 438031 |
| Network | EnviroSpark |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Apr 30, 2023 |
| Last updated at source | Mar 31, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.40 per kWh
Location
- Address
- 1930 Camden Rd
- City
- Charlotte
- State
- North Carolina
- ZIP
- 28203
- Coordinates
- 35.21107, -80.86101
Within ~15 km
Nearby charging
- Mecklenburg County52 ports
AmpUp · Available
- Mecklenburg County @ VCW28 ports
AmpUp · Available
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Asana Design Center offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.40 per kWh”. The site is listed as a other location.
How does Asana Design Center compare with other stations in Charlotte?
Charlotte has 303 charging stations in the DOE registry with 1,039 ports, the most of 259 cities and towns in North Carolina. Asana Design Center accounts for under 1% of the charging ports in Charlotte. EnviroSpark runs 4 stations in Charlotte. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Asana Design Center?
EnviroSpark operates 235 stations in the registry across 24 states, with 32 DC fast and 1,239 Level 2 ports in total. 16 of those stations are in North Carolina, under 1% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 30, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Mar 31, 2026.
Frequently asked questions
How many chargers does Asana Design Center have?
Asana Design Center has 2 charging ports: 2 Level 2.
Does Asana Design Center have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Asana Design Center have?
Asana Design Center has J1772 connectors.
Is charging at Asana Design Center free?
Pricing as reported to the DOE registry: $0.40 per kWh.
Is Asana Design Center open to the public?
Yes. Asana Design Center is listed with public access, and its status is available.
Where is Asana Design Center?
Asana Design Center is at 1930 Camden Rd, Charlotte, NC 28203. Its coordinates are 35.21107, -80.86101.
More EV charging around Charlotte
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 438031, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Asana Design Center, Charlotte, NC (AFDC station 438031)”, https://chargecensus.com/stations/north-carolina/asana-design-center-438031 (data as of October 12, 2026).