Addison Ridge Station 4
AvailableEV charging station in Fayetteville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 316408.
At a glance
Addison Ridge Station 4 is a public EV charging station at 730 Piper Farm Rd in Fayetteville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 1, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 316408 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 1, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 730 Piper Farm Rd
- City
- Fayetteville
- State
- North Carolina
- ZIP
- 28303
- Coordinates
- 35.09177, -78.97018
Within ~15 km
Nearby charging
- Fort Bragg138 ports
Non-networked · Available
Tesla Supercharger · Available
Blink · Available
Electrify America · Available
- Lafayette Ford4 ports
Ford Charge · Available
Blink · Available
What kind of charging does Addison Ridge Station 4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Addison Ridge Station 4 compare with other stations in Fayetteville?
Fayetteville has 26 charging stations in the DOE registry with 77 ports, the 12th-most of 259 cities and towns in North Carolina. Addison Ridge Station 4 accounts for 3% of the charging ports in Fayetteville. ChargePoint runs 15 stations in Fayetteville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates Addison Ridge Station 4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 1, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Addison Ridge Station 4 have?
Addison Ridge Station 4 has 2 charging ports: 2 Level 2.
Does Addison Ridge Station 4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Addison Ridge Station 4 have?
Addison Ridge Station 4 has J1772 connectors.
Is Addison Ridge Station 4 open to the public?
Yes. Addison Ridge Station 4 is listed with public access, and its status is available.
Where is Addison Ridge Station 4?
Addison Ridge Station 4 is at 730 Piper Farm Rd, Fayetteville, NC 28303. Its coordinates are 35.09177, -78.97018.
More EV charging around Fayetteville
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 316408, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Addison Ridge Station 4, Fayetteville, NC (AFDC station 316408)”, https://chargecensus.com/stations/north-carolina/addison-ridge-station-4-316408 (data as of October 12, 2026).