ChargeCensus

64 Charger EV 1

Available

EV charging station in Asheville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 169403.

At a glance

64 Charger EV 1 is a public EV charging station at 60 Mills Gap Rd in Asheville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 21, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID169403
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 21, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
60 Mills Gap Rd
ZIP
28803
Coordinates
35.49872, -82.51532

Within ~15 km

Nearby charging

What kind of charging does 64 Charger EV 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 64 Charger EV 1 compare with other stations in Asheville?

Asheville has 67 charging stations in the DOE registry with 265 ports, the 5th-most of 259 cities and towns in North Carolina. 64 Charger EV 1 accounts for under 1% of the charging ports in Asheville. ChargePoint runs 14 stations in Asheville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates 64 Charger EV 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 21, 2020, one of 90 stations in North Carolina with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 64 Charger EV 1 have?

64 Charger EV 1 has 2 charging ports: 2 Level 2.

Does 64 Charger EV 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 64 Charger EV 1 have?

64 Charger EV 1 has J1772 connectors.

Is 64 Charger EV 1 open to the public?

Yes. 64 Charger EV 1 is listed with public access, and its status is available.

Where is 64 Charger EV 1?

64 Charger EV 1 is at 60 Mills Gap Rd, Asheville, NC 28803. Its coordinates are 35.49872, -82.51532.

More EV charging around Asheville

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 169403, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “64 Charger EV 1, Asheville, NC (AFDC station 169403)”, https://chargecensus.com/stations/north-carolina/64-charger-ev-1-169403 (data as of October 12, 2026).