49 W Campus Dr
AvailableEV charging station in Flat Rock, North Carolina on the EV Connect network — 2 DC fast. US DOE AFDC station 322538.
At a glance
49 W Campus Dr is a public EV charging station at 49 W Campus Dr in Flat Rock, North Carolina, on the EV Connect network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 12, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 322538 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 12, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 49 W Campus Dr
- City
- Flat Rock
- State
- North Carolina
- ZIP
- 28731
- Coordinates
- 35.30771, -82.42641
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Parks Ford8 ports
Red E · Available
Non-networked · Available
- Holiday Inn Express2 ports
Non-networked · Available
- Flat Rock Nc Village Office2 ports
ChargePoint · Available
- Triangle Stop - Saluda2 ports
EV Connect · Available
What kind of charging does 49 W Campus Dr offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does 49 W Campus Dr compare with other stations in Flat Rock?
Flat Rock has 5 charging stations in the DOE registry with 9 ports. 49 W Campus Dr accounts for 22% of the charging ports in Flat Rock. It is the only EV Connect station in Flat Rock. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.
Who operates 49 W Campus Dr?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 74 of those stations are in North Carolina, 4% of the state's 2,050.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 12, 2023, one of 322 stations in North Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 49 W Campus Dr have?
49 W Campus Dr has 2 charging ports: 2 DC fast.
Does 49 W Campus Dr have DC fast charging?
Yes. The registry lists 2 DC fast ports at 49 W Campus Dr, with CHAdeMO and CCS connectors.
What connectors does 49 W Campus Dr have?
49 W Campus Dr has CHAdeMO and CCS connectors.
Is 49 W Campus Dr open to the public?
Yes. 49 W Campus Dr is listed with public access, and its status is available.
Where is 49 W Campus Dr?
49 W Campus Dr is at 49 W Campus Dr, Flat Rock, NC 28731. Its coordinates are 35.30771, -82.42641.
More EV charging around Flat Rock
Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 322538, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “49 W Campus Dr, Flat Rock, NC (AFDC station 322538)”, https://chargecensus.com/stations/north-carolina/49-w-campus-dr-322538 (data as of October 12, 2026).