Obe Embassy Albuq W
AvailableEV charging station in Albuquerque, New Mexico on the ChargePoint network — 2 Level 2. US DOE AFDC station 357861.
At a glance
Obe Embassy Albuq W is a public EV charging station at 1000 Woodward Place Northeast in Albuquerque, New Mexico, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 357861 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 11, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1000 Woodward Place Northeast
- City
- Albuquerque
- State
- New Mexico
- ZIP
- 87102
- Coordinates
- 35.09122, -106.63626
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- John Gordon Albuquerque Complex16 ports
Non-networked · Available
Tesla Supercharger · Available
Non-networked · Available
- Rich Ford10 ports
Synergev · Available
- Walmart 850 (Albuquerque, NM)10 ports
Electrify America · Available
What kind of charging does Obe Embassy Albuq W offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Mexico average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Obe Embassy Albuq W compare with other stations in Albuquerque?
Albuquerque has 173 charging stations in the DOE registry with 455 ports, the most of 84 cities and towns in New Mexico. Obe Embassy Albuq W accounts for under 1% of the charging ports in Albuquerque. ChargePoint runs 112 stations in Albuquerque. Statewide, New Mexico has 549 stations and 1,450 ports, the 32nd-largest station count of the 51 states and DC. The biggest station in New Mexico, Avanya Plaza - Tesla Supercharger in Albuquerque, has 24 ports.
Who operates Obe Embassy Albuq W?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in New Mexico, 55% of the state's 549.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 11, 2024, one of 93 stations in New Mexico with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Obe Embassy Albuq W have?
Obe Embassy Albuq W has 2 charging ports: 2 Level 2.
Does Obe Embassy Albuq W have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Obe Embassy Albuq W have?
Obe Embassy Albuq W has J1772 connectors.
Is Obe Embassy Albuq W open to the public?
Yes. Obe Embassy Albuq W is listed with public access, and its status is available.
Where is Obe Embassy Albuq W?
Obe Embassy Albuq W is at 1000 Woodward Place Northeast, Albuquerque, NM 87102. Its coordinates are 35.09122, -106.63626.
More EV charging around Albuquerque
Working with New Mexico charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 357861, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Obe Embassy Albuq W, Albuquerque, NM (AFDC station 357861)”, https://chargecensus.com/stations/new-mexico/obe-embassy-albuq-w-357861 (data as of October 12, 2026).